5-step roof installation process

Installation typically takes 1-2 days

Arrival

The crew and the project manager arrive in the morning and create a game plan.

Roof Graphic
Roof Graphic

Tear Off

The current roof is torn off. This is the messy part where most problems occur. It is very important to stay away from the job as materials are flying everywhere.

Inspection

The crew will inspect your decking to ensure that there is no rot, and that we are nailing to a solid nailable surface.
Roof Graphic
Roof Graphic

Installation

First the roof is “dried in.” This means the felt is covering the roof, and the drip edge is installed – making it water tight. After this the shingles and other components are installed.

Clean Up

At this point, the yard is rolled with a magnetic roller to pick up nails, the job is inspected by the foreman, and the crew leaves. The job is also inspected by the project manager. Also, it is important to note that the owner inspects every roof that is built.